Bathroom Remodels

Master Bath remodel.

Shower/tub and cabinets were salvaged.

All other aspects of bathroom were removed and replaced during renovation.

Old wall paper was removed and walls were repaired and resurfaced.

Flooring was removed and new tile put in its place.

Entire room was tiled up half the wall and above the shower.

New stone counter and vessal sinks were installed.

Replacement valves were installed throughout.

All fixtures were replaced.

The upper walls were sponge painted for a softer look.

Cabinet and trim were panted in a pastel of the wall color.

The following is a small Guest Bath.

A small tub was removed and a full stand up shower was constructed in its place.

All wall paper was removed, the walls repaired and resurfaced and the room was repainted.

The old flooring was removed and new tile laid.

New fixtures, valves, fan, lights, toilet and sink were all installed.

The old cabinet was salvaged and repainted. A new stone top was installed.

Here's Where You'll Find Us:

PKTroyDesign/Repair and Remodeling
2209 South Berrys Chapel Rd
Franklin, TN 37069

(by appointment)
Phone: 615.719.8298

Cell: 912.604.1791

e-mail:

paul.troy@comcast.net

30 years experience

References available

Check out our specials!